Expected Result
The TeaTwin project is designed to deliver a functional, deployment-ready software prototype that fundamentally transforms how SMEs approach detailed production planning. By successfully deploying this system, the project anticipates the following core outcomes:
-
Accelerated Time-to-Value: Slashing the time and resource expenditure required for both the initial generation and the continuous lifecycle maintenance of simulation models by a minimum of 50% .
-
Elimination of Data Bottlenecks: Achieving a massive reduction in manual data collection and modeling efforts through the direct, automated ingestion of existing SAP master and transactional data.
-
Closed-Loop KPI Optimization: Driving sustainable, real-world improvements in on-time delivery rates and significantly compressing production lead times. This is achieved through a closed-loop architecture that feeds simulation-validated, optimized schedules directly back into the live SAP ecosystem.
-
Democratization of Advanced Planning: Delivering an intuitive, highly accessible system that empowers standard production planners—without requiring specialized expertise in simulation engineering—to independently execute professional-grade, data-driven production scheduling.

Expected results from the project TeaTwin